Your Project. Our China Sourcing.

You close the deal and handle installation. We design the system, source every component from China's best factories, inspect production quality, and deliver it all in one shipment.

The Challenge

You’re a solar installer. A client asks you for a complete off-grid system — a farm, a villa, a telecom tower. You know exactly how to install it.

But sourcing the equipment? That’s where the headaches start.

You’d have to contact four or five different factories for the battery, inverter, panels, and accessories. Verify cross-brand compatibility — will Brand A’s battery actually communicate with Brand B’s inverter? Negotiate with each supplier in a language you don’t speak. Worry about quality from 8,000 kilometers away. Coordinate multiple shipments so everything arrives together. And handle warranty claims with factories in a different time zone.

You signed up to install solar — not to become a China sourcing manager.

How We Solve This

🛠️

System Design

We design the complete system based on your project’s load profile, location, and budget. You receive a professional proposal with topology diagrams and equipment comparisons from multiple factories.

🏭

Multi-Factory Sourcing

We pull the best components from different specialized factories — battery from a battery expert, inverter from an inverter specialist. Not locked into one brand’s limited catalog. All tested for compatibility before shipping.

Quality Control & Logistics

We inspect production at key stages, send you dated photo reports, and consolidate everything into one shipment. Your equipment arrives as a single delivery — ready to install, right off the pallet.

Your Project Journey

1

Tell Us About Your Project

Fill in our questionnaire or hop on a 20-minute video call. We map your loads, location, budget, and timeline.

2

We Deliver a System Proposal

Within 3-5 business days, receive a detailed proposal with topology diagram, equipment options, and full cost breakdown — all costs transparent.

3

We Execute Procurement & QC

Within 3-5 business days, receive a detailed proposal with topology diagram, equipment options, and full cost breakdown — all costs transparent.

4

We Ship. You Install.

All equipment consolidated, final inspected, shipped to your destination. You install with our remote guidance. We remain your warranty contact afterward.

Transparent Pricing

We charge for our work — not a markup on your equipment. You always see exactly what the factory charges.

📐

System Design & Proposal

$500 – $1,500

per project

One-time fee. Fully credited toward your procurement management fee if we proceed to sourcing.

🏭

Procurement & QC Management

5% – 10%

of total equipment cost

Covers supplier management, production quality inspections, multi-factory coordination, and shipment consolidation.

✈️

Factory Visit Accompaniment

$400/day

+ travel expenses

If you want to visit factories in person. We arrange the itinerary, provide translation, and guide technical discussions.

What you never pay: Hidden markups on equipment. We never add margin to factory prices. The invoice the factory issues is the price you pay — we show you every single one.

Project Example

📍 Johannesburg, South Africa

Poultry Farm — 10kWh Off-Grid System

The Situation

An installer in Johannesburg was asked to power a poultry farm's ventilation system and cold storage — completely off-grid. Local equipment quotes exceeded $6,000, and he had never sourced from China before. He needed a reliable partner who could guide him through the process.

What We Did

We designed a 10kWh LiFePO4 battery system paired with a 5kW pure sine wave inverter. The battery was sourced from a specialized manufacturer in Guangdong, the inverter from a factory in Shenzhen — we verified communication protocol compatibility before placing either order. All balance-of-system components — MC4 connectors, DC cabling, DC breakers, mounting hardware — were consolidated into the same shipment. We provided dated photo inspection reports at battery assembly, inverter testing, and final packaging stages.

The Result

Total equipment cost plus ocean freight and import duties came to approximately $4,100 — a savings of roughly 32% compared to the local quotes he had received. The system was installed in a single day with zero compatibility issues between the battery, inverter, and charge controller. The installer has since sourced three additional projects through us, citing the transparent process and photo QC reports as the key reasons he returned.

Frequently Asked Questions

FAQ 1:

Q: How is this different from buying from a single brand?

A single brand locks you into their ecosystem — their pricing structure, their proprietary accessories, their lead times. We select the best component for each part of your system from different specialized factories. More flexibility, better component-level pricing, and no forced lock-in. If one factory’s lead time slips, we can pivot to an alternative without redesigning the entire system.

FAQ 2:

Q: What about warranty and after-sales support?

We act as your single warranty coordination point. If any equipment develops an issue, you contact us — not four or five different factories in China. We diagnose the problem with you, engage the relevant manufacturer, and push for resolution — replacement parts, technical support, or warranty repair. We handle the language barrier and time zone gap so you don’t have to.

FAQ 3:

Q: What if my project is small — just a 5kW system for a single home?

That’s completely fine. Most of our projects start in the 5-30kW range. We’ve designed and sourced systems for single homes, small farms, remote telecom towers, and individual businesses. No project is too small to be done properly — and starting small is often the best way to build trust in a new sourcing relationship.

FAQ 4:

Q: How does payment work?

Payment terms are clearly outlined in our Service Agreement before any commitment. Typically, a deposit initiates procurement, with subsequent payments tied to production milestones — material readiness, assembly completion, testing sign-off. You pay equipment costs directly to the factories (we provide all invoices), and our service fee is paid separately. Every factory invoice is shared with you in full.

Have a Project in Mind?

Tell us about it. We’ll review your requirements and send back a preliminary assessment within 48 hours — no cost, no commitment.

Company

SynergyBridge Energy Limited

Registered in Hong Kong

Sourcing operations in Shenzhen, China

© 2026 SynergyBridge Energy. All rights reserved.

Connect

Hong Kong Office (Registered):ROOM 12, 6 FLOOR, THE CLOUD, 111 TUNG CHAU STREET, TAI KOK TSUI HONG KONG

China Operations:Nansha District, Guangzhou, Guangdong, China